LOCATION: Target, 3955 E Broad St, Columbus, OH 43213 (East Columbus, Whitehall area)
BUILDING TYPE: Big-box retail store, open to customers during the work
TRADES: Commercial Caulking and Joint Sealant | Exterior Commercial Painting | Retail Storefront Maintenance
Failed Roof-Edge and Panel Joint Sealant Cut Out and Replaced Along 195 Feet of Storefront
- Removed the existing joint sealant from five horizontal roof-edge joint runs, about 175 linear feet, plus the five adjoining vertical precast panel joints, about 20 linear feet.
- Cut, raked and cleaned the joint faces to sound concrete on both sides of every joint so the new sealant bonds to the substrate, not to old caulk.
- Installed closed-cell backer rod sized to the joint and primed the joint faces.
- Installed and tooled Tremco Dymonic 100 polyurethane joint sealant, color matched to the existing precast panel, in every joint listed above.
- Inspected the completed joints and struck any voids before moving the lift.
- Masked the brick below the roof edge and repainted the caulk line and metal flashing so the new sealant and the coping read as one clean edge from the parking lot.
- Worked from a 45-foot articulating boom lift with cones set around the perimeter and a pedestrian route kept open around the work area.
- Removed masking, debris and used material each day, swept the walkway and cart corral, and did a final walkthrough at completion.
Keeping Water Out of a Parapet Without Closing the Store
- The roof-edge joint is where the split-face block parapet meets the brick below it. When that sealant cracks and pulls away, water tracks behind the brick instead of shedding off the face, and the staining on the panels below the joints is what a failed joint looks like from the ground.
- Caulking over failed sealant is a short-term patch. Every joint here was cut back to clean concrete, given new backer rod so the sealant could flex, and primed, which is what lets a polyurethane sealant hold through Ohio freeze and thaw cycles.
- The store stayed open the whole time. The boom lift worked along the storefront and the side wall with the cart corral and walkway coned off, work hours coordinated with facilities management, and the area swept clean before each shift ended.
- Sealant and exterior maintenance calls like this come in through facilities managers and national retail accounts, the same work PaintWerks handles as a commercial general contractor and as a retail storefront painting contractor across Central Ohio.
Clean Joints, Painted Flashing, Open Doors
PaintWerks cut out and replaced roughly 195 linear feet of failed roof-edge and precast panel joint sealant at the East Columbus Target, prepping every joint to sound concrete, setting new backer rod and primer, and tooling in color-matched Tremco Dymonic 100. The caulk line and metal flashing were masked and repainted so the finished edge matches the building, and the store stayed open through the entire project with the walkway clear. Whether the call is a national retail account, a property manager or a general contractor, the prep standard and the scheduling discipline are the same.
Project Gallery
Before



During




After



Related Projects
- Seal Master Corporation Kent | Exterior Masonry Repair and Painting
- Target Westerville | Exterior Soffit Drywall Repair and Paint, 103 Feet of Storefront
- Target New Albany | Exterior ACM Canopy Repair, Fabrication and Refinish
- One Church Gahanna | Commercial Drywall and Painting, 935 SQ FT Renovation
Commercial Joint Sealant Questions
How do I know the joint sealant on my building has failed?
Look for sealant that has cracked across the joint, split along one edge, pulled away from the concrete or turned hard and chalky. Rust streaks and dark staining on the wall below a joint usually mean water is already getting behind it. On this Target the roof-edge sealant had split and peeled along the full run, and the staining on the panels below was the tell. PaintWerks inspects and replaces failed sealant as part of exterior commercial painting and building maintenance across Central Ohio. Call 614-582-4227 to have a building walked.
Why cut out the old sealant instead of caulking over it?
New sealant bonds to whatever it touches. Put it over old, failed caulk and it fails with the old caulk. Cutting the joint back to clean concrete, setting a closed-cell backer rod so the sealant has the right depth and can stretch, and priming the faces gives a polyurethane sealant like Dymonic 100 the two-sided adhesion it is designed for. It costs more labor up front than a bead over the top, and it is the difference between a joint that lasts and one that is back on the list in two seasons.
Can you replace exterior sealant on a retail building while it stays open?
Yes. This Target stayed open through the whole project. The boom lift worked along the storefront with the cart corral and walkway coned off, a pedestrian route stayed open at all times, work hours were coordinated with facilities management, and the walk was swept clean before each shift ended. PaintWerks schedules retail storefront maintenance around store traffic as a standard practice. Call 614-582-4227 for a free estimate.
What Our Clients Say